Monday, 3 April 2017
A new train Peppercorn class Tornado
LNER Peppercorn Class A1 60163 Tornado
| LNER Class A1 Peppercorn 60163 Tornado | |
|---|---|
Tornado, 14 December 2008 | |
| Type and origin | |
| Power type | Steam |
| Designer | Arthur Peppercorn (original designer) |
| Builder | A1 Steam Locomotive Trust |
| Build date | 1994–2008 |
| Specifications | |
| Configuration | 4-6-2 |
| Leading wheel diameter | 3 ft 2 in (0.97 m) |
| Driver diameter | 6 ft 8 in (2.03 m) |
| Trailing wheel diameter | 3 ft 8 in (1.12 m) |
| Length | 72 ft 11.75 in (22.24 m) |
| Width | 9 ft 2.875 in (2.82 m) |
| Height | 13 ft (3.96 m) |
| Axle load | 22.1 long tons (22.5 t) |
| Weight on drivers | 66.55 long tons (67.62 t) |
| Locomotive weight | 105.2 long tons (106.9 t)[1] |
| Tender weight | 60.9 long tons (61.9 t) |
| Locomotive and tender combined weight | 166.1 long tons (168.8 t) |
| Fuel type | Coal |
| Fuel capacity | 7.5 long tons (7.6 t) |
| Water capacity | 6,000 imp gal (27,000 L) |
| Boiler | Diagram 118 6 ft 5 in (1.96 m) diameter 29 ft 2 in (8.89 m) length |
| Boiler pressure | 250 psi (1,700 kPa) |
| Firegrate area | 50.0 sq ft (4.65 m2) |
| Heating surface: – Tubes | 1,211.6 sq ft (112.56 m2) |
| – Flues | 1,004.5 sq ft (93.32 m2) |
| – Firebox | 245.3 sq ft (22.79 m2) |
| – Total | 2,461.4 sq ft (228.67 m2) |
| Superheater area | 697.7 sq ft (64.82 m2) |
| Cylinder size | 19 in × 26 in (480 mm × 660 mm) |
| Performance figures | |
| Maximum speed | 100 mph (160 km/h) design[2] 75 mph (121 km/h) certified |
| Tractive effort | 2,700 metric horsepower (2,000 kW) |
| Career | |
| Number(s) | 60163 (display) 98863 (TOPS) |
| Official name | Tornado |
| Axle load class | Route availability 9 |
| First run | 29 July 2008 |
| Disposition | Operational. Approved for 75 mph (121 km/h) running on Network Rail track. |
Construction of Tornado began in 1994, and was based at Darlington Works for most of the project, while numerous components such as the boiler were manufactured elsewhere. The project was financed through fundraising initiatives such as public donations and sponsorship deals; further funding came from hiring out Tornado itself for special rail services. Construction was completed in 2008, and full certification of the locomotive was achieved in January 2009. Having been designed with compliance to modern safety and certification standards, Tornado has been conducting passenger services on the UK rail network and on mainline-connected heritage railways since 2008.
Sunday, 26 March 2017
1 meter class sailboat
1 meter class sailboat will be fad from the present widely used articles and other content, problems in later life out of your test of this browser's search engine just to deliver right pieces of information we all test to look for photos connected with typically the 1 meter class sailboat . along with the effects you will observe underneath ought to be examples of the illustrations or photos is definitely the case in point.
Foto Results 1 meter class sailboat
1 meter class sailboat - it's also been placed when using the requirement which always we all can activate beneficial to you truly. This information could provide as being a reference point while you are mixed up to choose the suitable guideline This 1 meter class sailboat reports could very well be your opportunity to become put on the job strategy, simply because it has got some method could truly feel even more gratified 1 meter class sailboat - Extremely helpful for yourself hence most people attempt to obtain a reliable source which can help you acquire determination while not frustration. don't forget to be able to take a note of these pages, mainly because it's possible at some point you should have the item returning when a person's inspirational strategies.